Scroll down

Two to tree layers of paint had to be removed from the church without damaging to old surface. Because of torbo they used only 13.200 lbs (6000 kg) of blasting media for a surface of 18.300 sqft (1700 sq ms). (0,7 lbs /sqft).

  • Blast hose: 260 ft 1" (80 m 25/7)
  • Blasting pressure at the machine: 28 and 57 PSI (2 and 4 bar)
  • Adjustment: S = 1,0 / Z = 0
  • Blast-media use: 132 lb/h (60 kg/h)
  • Water use during blasting: 3 US gal/h (12 l/h)
  • Blasting-media: 0,10 to 0,30 mm
  • Performance: 161 up to 215 sq ft/h (15 up to 20 qm/h)
More Success Stories
Keel of boat, Duisburg / DE
Keel of boat, Duisburg / DE
Show more
Marble cross, Black Forest/ DE
Marble cross, Black Forest/ DE
Show more
Friedrich Schiller University, Jena / DE
Friedrich Schiller University, Jena / DE
Show more
Cleaning a wooden church, Lappeenranta / FI
Cleaning a wooden church, Lappeenranta / FI
Show more